Product info:
GLUE insulation is a high-quality, solvent-free, Single
polyurethane foam adhesive for the rational, clean, economical and
permanently secure bonding of thermal insulation panels in the roof
area. This innovative adhesive foam also has low temperatures at the
beginning of a high liability, is also suitable for vertical bonding
and equalizes unevenness optimally. With its fast-curing, the bonding
after 2 hours to be reviewed. Compared to conventional polyurethane
adhesives have roof insulation GLUE with a huge weight reduction and
space and gain an overall approximately 30% reduction in working hours.
GLUE insulating material is economical and precise dose ranges and so
on up to about 14 sq meters insulation.
- Thermal insulation and sound -
Applications:
For permanently secure bonding of thermal insulation panels in the roof area.
Processing:
Before beginning work areas adjacent to the work area to protect
against pollution. Strong gusts of wind, make sure that the lightweight
insulation KLEBER not nearby components, objects or people can pollute.
Can fixed to unscrew the screw gun and the gun down about 30 x shake
vigorously so that the canned contents are well mixed, the adhesive
quality optimized and the yield is high. For longer breaks, the shaking
to repeat the desired quality properties to receive! By adjusting the
strand of the glue gun to about 30
Setting mm diameter. GLUE insulation directly on the ground
apply. The gun is in the application as perpendicular to hold. Also,
please note that at least 3 per m² Stänge are needed, or at the
Edge and corner, as well as increased Windsogbelastung (see DIN
1055, Part 4) the amount of adhesive must be increased accordingly. The
Pistolendüse is not on the insulating panel / subsoil established.
Pistolendüse between insulating panel and / underground during
the spraying is a distance of 1-2 cm observed. Shortly thereafter, and
wait
within about 8 minutes, the insulation plate press. (20 ° C-65%
rL - At higher temperature / humidity reduces - at a lower temperature
/ humidity increases this time.)
Light spraying of the glue strand accelerates the toughness. All
open joints in the insulation with insulation KLEBER fill. Within the
curing (approx. 2 hours) may not bonding
charged acts are committed. About person, fully hardened glue with a sharp knife cut away.
Processing temperature:
-5 º C to +35 degrees C (adhesive surface temperature)
+5 ° C to +25 ° C (canned temperature) - optimally +15- +25 ° C.
When needed, or tin in the cool warm water slowly
at the optimum temperature.
Cleaning: with PISTOLS & SPARKLING before CLEANERS
Curing, then with PU or mechanically REMOVER
eliminable
Repair: with insulation GLUE
Storage:
12 months from the date of production in unopened packaging in
cooler (+5 º C and +25 º C) and dry storage. The foam boxes must be
stored below the bonding of Sprühventiles ruled out. Dawn cans well
sealed and consume the short term.
Delivery:
750ml Aerosolsprühdose (12 cans per case)
Color:
champagne
>> Technical Data <<