Tok Fill

Tok Fill

0 of 5 Stars!(0 reviews) reviews

Delivery beginn within 24hrs Delivery beginn within 24hrs **
 

TOK Fill Aqua is a high performance compound for small damages on all traffic areas. It consists of a high-grade chippings / sand mixture and a polymer-modified bituminous binder with special additives (additives). After application, the material cures very quickly.

from 24 piece61,63EUR - you save 6,85EUR (10%)
baseprice: 2,47EUR / pro kg
Manufacturer:Denso
Model:10071056
Available Options:
Please select one of the following options.
« Overview
68,48EUR incl. 19% Tax plus shipping costs baseprice: 2,74EUR / pro kg


Tok Fill

Product info Tok Fill repair asphalt:

TOK Fill Aqua is a high performance compound for small damages on all traffic areas. It consists of a high-grade chippings / sand mixture and a polymer-modified bituminous binder with special additives (additives). After application, the material cures very quickly.

  • All-weather application at temperatures from -10 ° C to + 45 ° C (+ 14 ° F to + 113 ° F).
  • Application even on damp ground.
  • Ideal for the repair of potholes
  • Fast hardening after approx. 1h.
  • Solvent and tar free.

 

Areas of application cold asphalt:

TOK Fill Aqua is used to repair small damages, road crossings, damaged roads, roadway crossings, pipe trench breaches, backfill backfilling after sampling, removal of potholes and frost fractures, runway ramps, leveling and road surface modification.

Processing guidelines Tok Fill Aqua:

TOK-FILL can be processed by machine, or on small surfaces with the shovel, on a stable ground. Loose parts should be removed before installation. With a layer thickness of more than 4 cm, the TOK-FILL must be installed in layers. The maximum installation thickness is 18 cm in total. TOK-FILL has to be installed with a slight elevation, as the traffic is recompacted. Machine compaction is an advantage, but not mandatory. The processing can also be carried out in damp weather (wet or rainy) and at temperatures of -10 ° C to +25 ° C. However, there should be no water in the installation site itself. At falling temperatures (below 5 ° C), the material becomes somewhat firmer and in this case must be heated (heated storage room) for better processibility. The area renovated with TOK-FILL does not need to be despatched and can be used immediately without further processing. It should be noted that the material will not cure immediately after installation. The curing time is temperature dependent and may take longer at higher temperatures. When used in radial areas or where rotating point loads occur, the built-in material must not be loaded until sufficient strength has been achieved.

Material properties:

Grain size in mm: 0/5, installation thickness of 2 - 5 cm per layer
Application temperature: from -10 ° C to +45 ° C, even on damp surfaces
Density: approx. 2.0 g / cm2 (in compressed state)
Consumption: approx. 80 kg / m2, compacted condition with 4 cm installation thickness
Color: Black

Storage:

In the closed original packaging, the TOK-FILL can be stored at temperatures above +5 ° C and without load for at least 6 months. Do not store in direct sunlight, especially during the summer months.

Packaging:

25 Kg bucket (resealable) / 24 buckets per pallet

Tok Band Spezial DRTok Band Spezial DR
65,60EUR
incl. 19% Tax plus shipping costs
baseprice: 2,19EUR / pro m

Tok Band Spezial DR

Manufacturer: Denso
Item number: 10120
Delivery beginn within 3-5 days Delivery beginn within 3-5 days **

The TOK Band Special DR is a high-quality bituminous joint tape made of polymer-coated road bitumen, which has excellent stretch and adhesion properties. The TOK Band Spezial DR is available as a fusible or self-adhesive joint tape. The TOK Band Spezial DR and the associated primer CORRISOL Spezial correspond to the TL / TP Fug-StB and fulfill all the requirements of these guidelines.

Bookmark this page on .

loading... Tok Fill Tok Fill Tok Fill Tok Fill Tok Fill Tok Fill Tok Fill Tok Fill